Baseline DATA

The baseline data focuses on the current status of the selected parameters of indicators defined in the project’s LFM that can in turn be used by the project team to set up target values. Click here to download the entire document

Agro-ecological zones and main farming systems in the project area

The target districts of the project encompass the whole range of agro-ecological zones present in inland Cambodia. This extends from heavily flooded areas near Tonle Sap Lake (South of Soutr Nikom and Chi Kreaeng in Siem Reap, East of Moung Ruessei in Battambang) where floating, deep water and recession rice is grown, and fishing a main activity for farmers, to forested upland zones in the periphery of the project area (e.g. Rotonak Mondol and Sampov Lun in Battambang) where farmers mainly live from non-rice crops (maize, cassava), cattle grazing and agro-forestry activities.click here to download the entire document

ECOSORN planning process is participatory and decentralized

Community Action Plan, the participatory planning process of ECOSORN strategy is to develop Community Action Plan at commune levels. These plans have to be considered as project’s work plan at commune level, agreed and undersigned by all parties (Provincial Department of Planning, District Governor and Commune Council). The Commune Action Plans must be elaborated in coordination with existing plan and with the maximum participation of local stakeholders, using participatory approach.click here to download the entire document

Irrigation intervention for Rice Growing Community

In Cambodia, the long period of destructive conflict and instability is probably the main root contributor to the widespread poverty that currently exists. Indeed, those who were displaced, maimed, orphaned, or widowed by the conflict face the greatest hardships. Damage to infrastructure (particularly irrigation systems), land mines, and other security threats contributed to low agricultural production.click here to download the entire document

Poverty Issues in Target Provinces

Cell Box Culvert with Gate is a kind of sluice gate to increase water level and to distribute of water to large area of paddy fields. The kind of gate is useful for Cambodian rice farmers and communities to manage and to fairly distribute of water and to ensure adequate amount for the whole period of rice production.click here to download the entire document


Main Indicators


Maps, Charts

Poverty Indicators in all Communes of Target Provinces

Target Communes-Hachure-Banteay Meanchey

ECOSORN Target Communes & District Battambang Province


Technical Reports

Progress Report 6th

The 5th Progress Report from January to June 2008 outlines the overall project status, describes the implemented activities by Eptf and contractors’ partners, shows the achievements made and lessons learnt. The format of the report adapts to the “Practical Guide to Procedures for Programme Estimates” of the EC. This reporting period was largely focused on several start-up activities done by all contractors after the deadline of 16th November 2007 for signing of contracts. The project has organized the introduction tour for awarded contractors to visit target communes in 3 target provinces and continued to move towards applying the conceptualization of the Integrated Rural Development Modules (IRDM); with a special workshop on ALF and IRDM planned for July 2008. Besides, several workshops on strengthening of cooperation and participation by local authority in ECOSORN project have been conducted by Eptf at each province.click here to download the entire document